Mid Annandale AFC Grandstand and Toilet Block

Nairn Construction delivered the Mid Annandale AFC grandstand and a new toilet block for Dumfries and Galloway Council, improving the matchday experience for this well-loved local football club

ClientDumfries and Galloway Council
LocationLockerbie, Dumfries & Galloway
Home | Projects & Case Studies | Mid Annandale AFC Grandstand and Toilet Block

Requirements

Dumfries and Galloway Council appointed Nairn Construction Ltd as Main Contractor to deliver the Mid Annandale AFC grandstand. This new 100-seat, covered pitch-side stand was installed alongside a stand-alone prefabricated toilet block. Improving the spectator experience for this local amateur football club. In fact, this project was the latest in a series of improvements to the club’s facilities.

Crane lift of seats to Lockerbie Grandstand

Mid Annandale AFC provide football coaching and matches at all levels in the local community. This project was the latest in a series of improvements to the club’s facilities.

Some of the installation work inconvenienced public grounds bordering the facility. As a result, the main priority was to keep everything safe at all times throughout the installation.

Our Approach

First, our management team began planning the project early, completing the required health and safety documentation and statutory notices. We secured the long-lead prefabricated items in good time by coordinating our skilled in-house team with our network of specialist subcontractors.

We planned the construction programme over two visits. First, we completed the underground services and civil engineering works, including the foundations, concrete slabs and drainage. On our return, we installed the grandstand and prefabricated toilet block.

THE KEY WORKS CARRIED OUT ON THE MID ANNANDALE AFC GRANDSTAND WERE AS FOLLOWS:-

  • 200m of Utility trenches for power and water connections.
  • New foul water drainage connections into existing on site sewerage lines
  • We also altered the existing pitch-side spectator fencing and perimeter 5m-high ball-stop fencing to accommodate the new works
  • We then connected new utility services to the toilet block.
  • Subsequently, we installed a new structural concrete slab to site the modular grandstand.

  • We then connected new utility services to the toilet block
  • Reinstatement of existing block paving after completion of the installation of the toilet block
  • Connection of new utility services to the toilet block
  • Chlorination and legionella testing of new water supplies
  • Electrical testing and certification of new services

Results

The work is now complete, and the client has received all required operation and maintenance documents needed to operate the modified facilities. As a result, fans, spectators and parents have enjoyed using the new amenities at King Edward Park, which have been well received by the local community. We believe this update will help future-proof Mid Annandale AFC for years to come, enabling the club to keep offering a great service to the community.

It was a great honour for us to successfully bid for and win this contract for our local club. Indeed, the volunteers who run this well-established club have coached many children in the area, with several going on to play for senior teams. Overall, it was a great honour for us to successfully bid for and win this contract for our local club. Overall, it was a great honour for us to successfully bid for and win this contract for our local club.

money icon

On Budget

clock icon

On Time

construction worker icon

Carried out Safely

happy face icon

Happy Client

Testimonial

“From the moment that Nairn Construction Ltd was awarded the contract and initial contact was made with Craig (Nairn) and Michael(Kirkpatrick) we (The Mids) knew we were onto a winner. After our initial meeting a plan was drawn up that gave us a start date and because the work would possibly interfere with the Clubs fixtures and park bookings we were able to alter some arrangements that meant minimum disruption to all the local users.

Once the work started Michael was in constant touch with us keeping us updated on all progress and this was backed up with various on site briefings. At no time was anything a problem and he made it clear we could contact him anytime day or night.

All work carried out was of high quality, completed before the original timeline and with minimum fuss. Nothing was a problem and Nairn Construction Ltd even went beyond the original plan by providing a new safer pathway for supporters to access the new facility at no extra cost, something that is very much appreciated by all connected to Mid Annandale AFC.

Mid Annandale AFC would highly recommend Nairn Construction Ltd to carry out work to anyone who wants a company that delivers a professional job – from initial thoughts to completion – a very safe, tidy, honest job from start to finish and beyond where nothing is a problem. Michael is a huge asset to the company and Craig fronts a team of workers that the company can be very proud of.

CONTINUED SUPPORT FOR MID ANNANDALE AFC

Since completion of the grandstand and toilet block we have since used Nairn Construction Ltd to carry out some repair and refurbishment work in our pavilion and once again they fully delivered. Again Michael and Craig attended during the Christmas holiday period and made sure minimum disruption to our quest to deliver a service to the community.

Mid Annandale AFC are very happy to be associated with Nairn Construction Ltd”

Scott McMillan, Chairman – Mid Annandale AFC

This site uses cookies.
ConfigureHide Options
 
Read our privacy policy

This site uses cookies for marketing, personalisation, and analysis purposes. You can opt out of this at any time or view our full privacy policy for more information.