Requirements
Nairn Construction Ltd were employed by a domestic self build home builder to carry out substructure works for their new project in Carlisle. The client was aiming to build the project himself, but did not have the expertise, knowledge or site team to carry out the retaining basement structures.

The client required us to carry out cut and fill bulk earth works to create the footprint of the new property, below ground drainage works for foul water, basement foundations and retaining wall structure, which included designed shuttering, reinforcing steelwork, water barriers and waterproof concrete.
Our Approach
After receiving design information from the client, Nairn Construction Ltd, engaged with a Structural Engineer and formwork supplier to develop the design and to produce a temporary works design for the formwork. Once the initial designs were received, the Nairn team checked the information against architects details and dimension and proceeded to the construction phase.
The key works carried out by Nairn were as follows:-
- Bulk earthworks to create safe working room around proposed retaining structure
- Excavation of wall and building foundations
- Reinforcement steel fixing
- Concrete installation
- Form work construction
- Tanking and drainage works behind retaining structure
- Backfilling and compaction works
- Underground sewer drainage
RESULTS OF THE SUBSTRUCTURE WORKS IN CARLISLE
This substructure works project in Carlisle was completed in a quick and professional manner, allowing the client to commence the self-build works on the rest of the property without having to handle the heavy earthworks and retaining structures himself. The client was delighted with the standard of finish and the smooth handover into the next phase of the build.
On Budget
On Time
Carried out Safely
Happy Client
Testimonial
Craig and his team were very professional and the standard of work was second to none. Clear pricing and excellent communications with an open friendly service.